must be the covers adopted to
reach the condition of reliability
index stabilization. Thus, this
type of analyses gives an in-
teresting parameter which can
be used to establish periods of
structural maintenance accor-
ding the type of concrete used
and the environment where the
structure is located.
5.3 Example 3
The proposed probabilistic mo-
del can be used to determine
intervals of time in order to plan
inspection and maintenance
procedures in reinforced concrete structures as function of w/c ra-
tio adopted. For each w/c value adopted for concrete conception,
an abacus can be constructed using the probabilistic model. These
abacuses allow the choice of an optimum value of concrete cover
in order to perform maintenance procedures in fixed time intervals.
It is important to stress that these intervals are based on safety
criterion. Then, the costs involved in maintenance and repair costs
are not considered.
For this proposal, a reference value, named target, of reliability
index was chosen, which was assumed as minimum requirement
of safety. Then, when the structure has a reliability index lower
than the target one, maintenance is required. According [29], the
target reliability index expresses the requirements of structural sa-
fety, which guarantees acceptable values of structural failure risk
considering a given scenario. In this regard, [29] defines a set of
values of target reliability index considering failure limit state and
serviceability limit state scenarios. The corrosion time initiation is
considered as a serviceability limit state scenario. In this study, the
loss of reinforcements cross sections have not been considered,
which is a failure limit state. Therefore, the target reliability index
adopted is 1.30 leading a probability of failure close to 10%. Other
values of target reliability index can, evidently, be adopted as func-
tion of the structural risk desired.
The analyses in this application were carried out considering the
random variables presented in table 2, as well its statistical proper-
ties. It was considered two clas-
ses of aggressiveness, C.A.
II and C.A. III. The abacuses
involving reliability index, time
and cover depth for C.A.II are
presented in figures 13 and 14.
It is worth to mention that only
w/c ratio 0.40 and 0.50 were
analyzed, since higher w/c ratio
led to reliability indexes lower
than the target. Consequently,
it indicates that these w/c ratios
should not be used in reinforced
concrete applications.
Figure 13 presents the beha-
viour of the reliability index in
function of time for concretes
with w/c ratio equal to 0.40 and C.A.II. According these results,
cover depth value of 10mm is not recommended, because it indi-
cates failure (reliability index lower than the target) even for short
time after construction. For cover depth of 20mm, the maintenance
procedures should be performed 10 years after construction. At
this time, the structural reliability index is equal to the target. After
this time, the structural reliability becomes lower than the target,
indicating failure. It is worth to mention that cover depths values
bigger than 30mm lead maintenance time interval bigger than 25
years. In these cases, the analysts should study the possibility of
change of w/c ratio in order to allow, at least, one inspection in the
first 25 years of structural life-time.
Similar behaviour can be observed in figure 14, where concretes
with w/c 0.50 and C.A. II were considered. In this case, the mini-
mum cover required is 30mm, which lead to maintenance procedu-
res 8 years after construction. Otherwise, considering cover depth
equal to 50mm, the maintenance procedure should be performed
21 years after construction in order to keep the structural safety
at a desired level. Therefore, by changing the cover depth from
30mm to 50mm, or increasing the cover in 20mm, the maintenance
can be performed 13 years later.
On the other hand, considering cover depth of 30mm, the main-
tenance time for concretes with w/c ratio 0.40 and 0.50 are 23
and 8 years, respectively, in C.A.II. Then, it can be verified an in-
crement of 187.5% on the maintenance time interval by slightly
Figure 12 – Evolution for probability of corrosion
initiation – C.A.III structural life-time = 25 years
0,0
0,2
0,4
0,6
0,8
1,0
10,0
20,0
30,0
40,0
50,0
60,0
Concrete cover (mm)
Probability of corrosion
initiation
w/c=0,4
w/c=0,5
w/c=0,6
w/c=0,7
Figure 13 – Required reliability index
abacus for C.A.II and w/c = 0.40
0.00
0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
5
7
9 11 13 15 17 19 21 23 25
Time (years)
Reliability index
p=10
p=20
p=30
p=40
p=50
p=60
target
Figure 14 – Required reliability index
abacus for C.A.II and w/c = 0.50
-0.50
-0.25
0.00
0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
5
7
9 11 13 15 17 19 21 23 25
Time (years)
Reliability index
p=10
p=20
p=30
p=40
p=50
p=60
target